Our Track Record

2023

1. Environmental Monitoring Plan and Environmental Monitoring Report

2. Preparation of Environmental Impact Assessment & Land Conversion Permit Application for a Foundry Project at Rose Belle

3. Environmental Monitoring Plan and Environmental Monitoring Reports for a 1MW PV Farm Project in Rodrigues by Corexsolar International (Mauritius) Ltd

2021

19. ENL Group Waste Management Strategy for Inter-Company Industrial Symbiosis

20. Environment Health and Safety Audit for ABE Industrial Products (IO) Ltd

21. Independent Environmental and Social Review of the Merville Ltd 5* Hotel Project by LUX

22. Environment Management & Monitoring for JinFei Eden Development Company Ltd

23. Environmental Impact Assessment (EIA) for Installation of Two

Candock Floating Pontoons at the Waterclub PDS situated at La Balise Marina

2020

24. Environmental Impact Assessment (EIA) for a Stone Crusher Ltd,

including Block Making, Ready Mix, Asphalt Plant at Chamouny

25. Environmental Impact Assessment (EIA) for Eastern Stone Crusher Ltd at Fond du Sac

26. Environmental Compliance Review Report for Ocean Grand Gaube Apartment Complex

27. Environment Impact Assessment for the Construction of Bain Boeuf Apartments of 84 Keys at Bain Boeuf

28. Construction Environmental Management Plan (CEMP) at Beau Plan Smart City

29. Preliminary Environment Reports (PER) for Proposed Manufacture of Medical Plastic Tubings

30. Environment Management and Monitoring for the Proposed

Photovoltaic Solar Farm project of 4.88 MW AC at Petite Riviere

31. Consultancy Services for the Preparation of Environmental Impact Assessment (EIA) for the Decommissioning of the Medine Sugar Milling Co. Ltd

32. Environmental Impact Assessment Reports(EIA) / Preliminary

Environment Reports (PER) / Social Impact Assessment Reports (SIA) / Environment management Plans for 6 (six) PDS Projects by Two Futures Ltd and /or associated companies of Two Futures Ltd

2018

38. Consultancy Services for the Preparation of Environmental Impact Assessment (EIA) for the Construction of the New Jetty at Ile

Mangenie

39. Consultancy Services for the Preparation of a Preliminary

Environmental Report (PER) for the Manufacture of Ready-Mix

Concrete at Alma

40. Consultancy Services for the Preparation of a Preliminary

Environmental Report (PER) for the Manufacture of Ready-Mix

Concrete at a New Plant in Geoffroy

41. Consultancy Services for the Preparation of Environmental Impact Assessment Report for 250 Keys Hotel at Petite Riviere Noire

42. Environmental Management and Monitoring Plan in connection with Design and Build/ Turnkey Project for the Construction of a Grade Separated Junction on the Motorway M1 at Deschartes Street and other upgrading works

43. Preliminary Environment Reports (PER) for Proposed Plant for the Manufacturing of Fibre Optic Cable Fibre Optic Cable

2016

51. Environmental Impact Assessment for the Setting up of an Oyster

Farm at Sud Pointe Grande Passe By Mascareignas Oysters

(Mauritius) ltd

52. Preliminary Environmental Report for a Concrete Batching Plant and Lean Mix Batching Plant

53. Environmental Monitoring Report for the Construction of a New Airport Access Road to SSR International Airport

54. Environmental Audit Report for site Inspection and Remedial Measures to contain Rainwater Run – off at the Premixed Concrete plant of Bambous

2022

4. Environment Impact Assessment & Environment Monitoring Plan for Cascavelle Hospital Ltd c/o Medine Ltd

5. Preliminary and Comprehensive Environment Impact Assessment for the Proposed Mauritius Battery Anode Facility

6. Gap Analysis between IFC PS and Mauritian Legal Framework in

relation to PV Projects

7. Environment Management & Monitoring for Wind farm Project

8. Preparation of Environmental Impact Assessment Report (EIA) for 4 PV BESS Projects by Qair

9. Consultancy services for Facilitation and Negotiation to remove or limit Medine LTD’s liability in connection with lava tunnels under VRS Morcellement at Palma

10. Environmental Impact Assessment Report for the proposed 26 keys Tamarina Golf Lodges Project

11. Environmental Impact Assessment for an Asphalt Plant at L’Aventure by Eastern Stone Crusher Ltd

12. Environmental Impact Assessment (EIA) for proposed 15MW Solar PV Power Projects at Le Val

13. Environmental Impact Assessment (EIA) for the construction of Moka Eye Hospital

14. Preliminary Environmental for the Installation of a Containerised Paint Recycling Plant at Petit Verger

15. Environmental Impact Assessment (EIA) for Setting up of 2.0 MWP Floating PV Plant at Tamarind Falls Reservoir, Mauritius

16. Environmental Impact Assessment (EIA) for the setting up of a Solar Farm of 10 MW Arsenal

17. Environmental Impact Assessment (EIA) for the Construction of La Pirogue Residences at Wolmar Flic-en Flac

18. Environmental Impact for the Setting up of an Oxygen Manufacturing Plant at Petit Verger

19. MCCI Roadmap for Waste Plastic Free Mauritius

2019

33. Environment Management & Monitoring for the Construction of the Public Aquarium of Port Louis at Les Salines

34. Environment Management & Monitoring for Wind farm Project at

Plaines des Roches

35. Consultancy Services for the Implementation of an Environment

Management System Certifiable to ISO 14001:2015 at Princes Tuna

(Mauritius) Ltd

36. Licences and Permits for the Operation of a 135 Keys Serviced Senior Residence/Tourist Residence at Grand Baie by the AEGIDE Group

37. Consultancy Services for the Preparation of Environmental and Social Impact Assessment (ESIA) for a Seismic Survey

2017

44. Environmental Impact Assessment Reports(EIA) / Preliminary

Environment Reports (PER) / Social Impact Assessment Reports (SIA) / Environment management Plans for 6 (six) PDS Projects by Two Futures Ltd and /or associated companies of Two Futures Ltd

45. Preliminary Environmental Report for the Proposed Green Tea Factory at Dubreuil

46. Environmental Impact Assessment Report for the Proposed Project for Steam Production from Treated Used Cooking Oil by Avantime Ltd

47. Preparation of an Environmental Impact Assessment Report for the Proposed 185 Keys Hotel at Baie Du Tombeau by Mauritius Jin Fei Economic Trade and Cooperation Zone Co Ltd

48. Preparation of a report to seek clearances for Artisanal Farming of Crabs at Barachois Anse Bambous

49. Environmental Impact Assessment Report for the Proposed

Photovoltaic Solar Farm project of 4.88 MW Ac at Petite Riviere

50. Environmental Impact Assessment for the Proposed Photovoltaic Plant of 12.24 MW at Queen Victoria Solar Farm

2015

55. Environmental Impact Assessment for Proposed Project “Paille De Canne de Cogénération” at Terragen Ltd

56. Environmental Management and Monitoring Services in connection with the replacement of Boilers and Upgrade of Electricity Co-generation

57. Environmental Impact Assessment Report for the Proposed Project for the Construction of a Mixed-Use Building

58. Environment Monitoring and Management Plan at Mauritius Container Terminal Project Site

59. Social Consultations and Preparation of Social Programme for

Investment for an IRS Project by Mont Choisy Property Development

Ltd

2014

60. Environmental Management and Monitoring Services during

Construction of the 17.85 MW Wind Farm by EOLE de Plaine des

Roches

61. Preliminary Environmental Report (PER) for Proposed Construction of New Island Brush Factory at Saint Antoine, Goodlands

62. Implementation of Environment Management System (EMS) ISO

14001: 2004 for Innodis Ltd at Beau Climat

63. Consultancy Services for the Setting Up of a Vehicle Examination

Station at Laventure

64. Review Compliance to Equator Principles, IFC’s EHS Guidelines and IFC’s Performance Standards on Environmental and Social

Sustainability for the Proposed Wind Farm Project at Plaine Sophie

65. Preparation of EIA Report and BLUP in connection with the

replacement of Boilers and Upgrade of Electricity Co- generation by

Medine Sugar Milling Company Ltd

66. Environmental Monitoring Plant for 14 Wind Turbines at Plaine Sophie

67. Preparation of an amendment to the Environment Impact Assessment license for the Construction and Operation of a Wind Farm at Plaine des Roches

2011

75. Consultancy Services for Energy Efficiency in Moroccan Manufacturing Sector

76. Modelling of Environmental impacts for 18 MW Wind Farm by Aerowatt

77. Environmental Monitoring Services for the SSR International Airport Expansion Project by China State Construction Engineering

Corporation

78. Environment Impact Assessment for the Operation of an Existing

Stone Crushing Plant and the Setting up of a Block Making Plant, a

Bitumen Plant and a Concrete Mixing Plant by La Rocaille Ltee

79. Environment Impact Assessment Report for the Installation of a

medical waste incinerator at Jawaharlall Nehru Hospital in Rose Belle

2009

89. Energy Auditing and Project Management for energy efficiency by Apavou Hotels.

90. Traffic count and preparation of TIA report by Indian Ocean Real

Estate Company (IOREC)

91. Energy Auditing and Project Management by Mauritius Commercial Bank Ltd (MCB)

92. Environmental Impact Assessment Report for the Extension of Indian Resort & Spa for the Apavou Group by Apavou Hotels

2007

106. Environmental Impact Assessment for the operation of a beach

hotel comprising of 39 rooms at Pointe aux Piments by Chilipoint Ltd

107. Consultancy Services for the implementation of an Environmental Management System based on Green Globe 21 standard by One and Only Le Saint Geran Hotel

108. Environmental Impact Assessment for the construction and

operation of a beach restaurant attached to the Blue Ocean Park Hotel by Sagar Hotels & Resorts Ltd

109. Environmental Impact Assessment for the creation of swimming zones and beach reprofiling in front of the Blue Ocean Park Hotel as well as the construction of a jetty, desalination wastewater systems by Sagar Hotels  Resorts Ltd

2006

110. Preliminary Environment Report for a textile knitting unit with 50 machines by Texpull Ltd

111. Preliminary Environment Report for the renovation of a home for the elderly by Bonne Terre Home for the Elderly

112. Preliminary Environment Report for a proposed bakery project at Tamarin by Peche Mignon Ltee

113. Preliminary Environment Report for the complete renovation of the petroleum retail outlet at Curepipe by Caltex

114. Consultancy Services for large scale composting of organic waste including un-segregated municipal solid waste in Mauritius including Preliminary Environment Report and Marketing Plan by Solid Waste Recycling Co Ltd

115. Preliminary Environment Report for the construction of a residential complex at Bain Boeuf by Admiral Court Ltd (Gleeds Ltd)

116. Preliminary Environmental Report for the proposed construction of 24 Housing Units at Curepipe by Paris Belle Epoque (Gleeds Ltd) Our Track Record

117. Preliminary Environmental Report for proposed project for the

setting up of an Art Glassmaking Factory & Shop at Trou aux Biches by Rocki Mtius Ltd

118. Preliminary Environmental Report for the proposed petroleum retail outlet at La Vigie on the Motorway by Caltex

119. Environmental Impact Assessment for the Production, Distribution, Combustion of Coal Water Slurry (CWS) including Post-Combustion Gas Cleaning by Avantime Ltd

120. Determination of the status of Energy Efficiency and Energy

Conservation in Buildings in the Republic of Mauritius by UNDP.

121. System Audit with respect to ISO 14001:2004 by SITAM (Majunga)

122. System Audit with respect to ISO 14001:2004 by SACIMEM

(Antsirabe) at Madagascar.

123. Environmental Impact Assessment for the construction of 83

housing units by Societe de l’Horizon

124. Environmental Impact Assessment for the construction and

operation of a clinic for hair grafting at Trou aux Biches by

Challeng’hair Ltd

2004

133. Strategic Environmental Assessment (SEA) of 3 production

systems (potato, deer and palm) by Mauritius Chamber of Agriculture

134. Gap Analysis and identification of Hazard Analysis Critical Control Points

135. Benchmarking for Green Globe Certification by Le Prince Maurice

136. Environmental Impact Assessment for proposed plant for the

manufacture of Tile Adhesives by MMC International Ltd

2002

145. Diagnosis of the company’s strength and weaknesses and

identification of direct technical assistance to improve performance

146. Opportunities for domestic energy savings in Rodrigues – Impact of the introduction of CFLs by Rodrigues Council of Social Services

147. Electrification of Agalega Island using Biofuels from Coconut by

United Nations Development Programme

148. Assessment of Bagasse Cogeneration in Mauritius by NEDO,

Japan

149. Consultancy services for implementation of an Environment

Management System (ISO 14001:2004 Implementation) for Esquel

Group (Textile Industries Ltd)

150. Environmental planning and facilitation of licenses of a proposed 44 room hotel project in Rodrigues Island by Pleasure Bay Ltd

151. Performed an Economic Impact Assessment of the Plaines

Wilhems Sewerage Project by Montgomery Watson (UK)

2001

152. Consultancy services for the implementation of a Quality

Assurance System (ISO 9001:2000 Implementation)

153. Consultancy services for the implementation of an Environment

Management System (ISO 14001:2004 Implementation) by

Queenswear Ltd

154. Feasibility for Bagasse utilisation in Cogeneration by National

Renewables Energy Laboratory, USA

2013

68. Application for Water resources Unit Clearance for Proposed Real

Estate Project at Black River by Turnkey Management Ltd

69. Preliminary Environmental Report and Public Consultation Report for Proposed Installation of a Temporary Semi-Mobile Ready-Mix Concrete Batching Plant at Alma by Pre-Mixed Concrete Ltd

70. Environment Impact Assessment Report for Proposed Project for the Setting up of a Pyrolysis Plant for Recycling Scrap Tyre/Rubber and

Plastic at Nouvelle France by Sujoy Vishnu Enterprise (Mtius) Ltd

71. Environment Impact Assessment Report for Proposed Stone Crushing and Block Making Plant at Fond du Sac by Eastern Stone Crusher Ltd

2012

72. Environment Impact Assessment & Traffic Impact Assessment Reports for the proposed Vehicle Examination Station at L’Aventure

73. Environment Impact Assessment & Traffic Impact Assessment Reports for the proposed Vehicle Examination Station at Forest Side

74. Environment Impact Assessment & Traffic Impact Assessment Reports for Neotown Les Salines Development Ltd

2010

80. Energy Management Consultancy for energy savings in hotels in Mauritius by Enterprise Mauritius & AHRIM

81. Energy Management Consultancy Services for Data Communications Ltd

82. Energy Management Consultancy Services for Fit U Garment Ltd

83. Energy Management Consultancy Services for Prest Plastics Ltd

84. Energy Management Consultancy Services for Ramdenee Edible Oil Products Ltd

85. Energy Management Consultancy Services for ABC Motors Co Ltd

86. Environmental Impact Assessment report for the construction of a beach hotel in Rodrigues, including desalination wastewater systems by Var Investment Ltd.

87. Evaluation of the Grand scheme, product standards and advice of on how to further increase the usage of SWH in Mauritius by Ministry of Renewable Energy and Public Utilities under the authority of the United Nations Development program

88. Energy Auditing and Project Management by Tee sun Co Ltd (Palmar Group)

2008

93. Market Study for the Implementation of a Food and Environmental Testing Laboratory by Intertek (Mauritius) Ltd by Intertek (Mauritius) Limited

94. Implementation of ISO 22000 Standard by Constance Lemuria Resorts (Seychelles)

95. Preparation of the Social Impact Assessment Report by Belle Riviere Estate

96. Preparation of Site Environmental Audit Report by ACTIS Ltd (UK)

97. Implementation of food safety procedures and systems by SOPHALCO Ltd

98. Facilitate implementation of used oil re-refining facility, EIA licence by Star Ecoenergy Ltd

99. Identify all eco-industries acting in Mauritius in the waste, water and Our Track Record energy sectors by Ernst & Young Ltd

100. A system of data collection, processing, analysis and monitoring for the FAD fishery by FAD / Ministry of Agro-Industry and Fisheries

101. Consultancy services for the implementation of a Quality

Assurance System (ISO 9001:2000 Implementation) by SATIM

(Mauritius)

102. Assist in management of various environmental concerns at the

Rose Belle Ethanol plant by Alcodis Ltd

103. Consultancy services for the implementation of a Environmental Risk Management System (ISO 14001:2004 Implementation) by Alcodis Ltd

104. Consultancy services for assistance to participate in the

Environmental Reporting Award of the Ministry of Environment by

Maurilait Production Ltee

105. Assistance to TOTAL MAURITIUS in connection with environmental implications of fuel switching for industrial client sites by Total Mauritius Limited

2005

125. Environmental Impact Assessment for a luxury housing project at Grand Bay by Super Construction Co. Ltd

126. Environmental Impact Assessment for the construction of a

residential complex of 82 Housing Units at Belle Rose by Les

Entreprise Phi Ltee

127. Environmental Impact Assessment for the proposed petroleum

retail outlet at St Julien by Caltex (Mauritius) Ltd, St Julien

128. Environmental Impact Assessment for the proposed petroleum

retail outlet at Mare D’Australia by Caltex (Mauritius) Ltd, Mare

D’Australia

129. Feasibility and opportunity study of a new Pharmacy including

survey of potential customers by Pharmacy Seegobin

130. Preliminary Environment Reports for 7 petroleum retail outlets by Indian Oil (Mauritius) Ltd

131. Consultancy services for the implementation of a Quality

Assurance System (ISO 9001:2000 Implementation) by State

Insurance Corporation Of Mauritius

132. Project concept development and environmental planning for

proposed Camp de Vacances in Rodrigues Island

2003

137. Survey of fishers and Economic/Environmental Impact Assessment of FAD technology by Ministry of Fisheries at Rodrigues Our Track Record

138. Regional Biomass Assessment for six pacific islands and

preparation of a strategy for biomass resource management by

SOPAC (South Pacific Applied Geosciences Commission)

139. Consultancy services for the implementation of a Quality

Assurance System in the following branches: Mauritius Telecom Ltd,

Cellplus Ltd, Telecom Plus Ltd, Teleservices Ltd, Mauritius Telecom

(Rodrigues) Ltd

140. Employee Skills Enhancement Project by Pad & Co. Ltd

141. Development of an Environment Information System for the

Ministry of Environment in association with SMEC by Ministry of

Environment

142. Feasibility and site identification together with Environmental

Impact Identification for a Seaweed Farming in Rodrigues by Ministry of Fisheries.

143. Consultancy services for the implementation of a Quality

Assurance System (ISO 9001:2000 Implementation) by Prosimex Ltd / Unicorn Ltd / Alpha Cleaning Ltd

144. Consultancy services for the implementation of an Environment

Management System (ISO 14001:2004 Implementation) by Southern

Textile Ltd

2000

155. Energy Management Framework at the Ferney Spinning Mills.

156. Consultancy services for implementation of Environment

Management System

157. Consultancy services for implementation of Quality Assurance System

158. Seminar on Solid Waste Management System for personnel &

maintenance managers of over 20 beach resort hotels in Mauritius

159. Consultancy services for implementation of a Quality Assurance

System (ISO 9002:1994 Implementation) for Green Cross Medical Laboratory

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Connect with us